In order to ensure successful and safe start-up of equipment, TET Estel testing specialists visiting the site to carry out commissioning work.
If necessary, our specialists can also supervise the equipment installation (chief – supervision), which takes place right before commissioning.
To comply with an efficiency of the overall project and guarantee the highest result, all of the terms and site readiness pre-conditions must be negotiated before leaving experts’ for the premises. Thus, start-up operations can be carried out in shortest possible time frame, allowing the equipment to become in operation condition as soon as possible.
Portfolio
Complex supply of power units for DC arc furnaces.
Development and supply of frequency converters according to special Airbus requirements for the final stage of the Airbus A350 aircraft assembly line.
Unique 25 MWt SMES-modulator for clistron control
Specific technical characteristics rectifier for Big Hadron Collider